top of page
code org

FOURTH
QUARTER
4th Period

Coding 

codeicon.png
2026-Q4 Calendar.png

CSFEx Lessons
1.Programming w/ Angry Birds
2. Debugging in Maze 
​​

3. Collecting Treasure w/Laurel

4. Creating Art w/Code

CSFEx Lessons

5. Swimming Fish in Sprite Lab

6. Making Sprites

7. Sprites in Action

8. Virtual Pet w/Sprite 9.

CSFEx  Lessons

8. Virtual Pet w/Sprite 9. LabDance Party 

10. Loops w/Rey & BB-8

11. Mini-Project: Sticker Art

CSFEx Lessons

12. Nested Loops in Maze

13. Snowflakes w/Anna & Elsa

14. Looking Ahead w/Minecraft

15. If/Else w/Bee

​

CSFEx Lessons  

19. Harvesting w/Conditionals 

20. Functions in Minecraft​

21. Functions w/Artist

Unit 6 Lesson 17

Physical Outputs and LEDs

 to Dot 8a; Don't complete 8b or 8c

then work on 

Unit 6 Lesson 10 
Combining Inputs & Outputs

​

CSFEx L16 & L17 & L18

16. While Loops w/the Farmer

17. Conditionals w/Minecraft -VA

18. Until Loops in Maze

CSFEx Lessons
22.
 Functions w/Harvester

23. Text & Prompts

24. Counting with Variables

CSFEx Lessons

25. Using Variables w/the Artist

26. Variables w/Bee

27. For Loops w/Bee

28. For Loops w/Artist

CSFEx Lesson 29

End of Course Projects 1 & 2​

Unit 6 Lesson 15 (2021)

Circuits and Physical Prototypes

(1 to 1.5 day project)

iMovie
if Writing Test stil going

iMovie

iMovie

iMovie

 Unit 6 Lesson 15

Functions Day 1

Dots 1-10

iMovie iMovie iMovie

Colorful Eggs in Basket

No School
Easter Holiday

Graduation
iMovie

aasa.png

ACT Aspire Gr9

aasa.png

Gr 3-8 & Gr9 ACT-Aspire

images.png

Gr 11 03-31

 Unit 6 Lesson 15

Functions Day 2

Dots 11-13

Unit 6 Lesson 15 (2021)

Circuits and Physical Prototypes

(1 to 1.5 day project)

If iMovie is complete, notify me, Ms. Perkins, or Mrs. Smith to check

music fading before exporting to file. 

Then start CSF Express: *LINK TO REQUIREMENTS:
You may skip FREE PLAYS.

CSFEx Lesson 29

End of Course Projects 3 & 4​

*LINK TO REQUIREMENTS; You may skip FREE PLAYS

*LINK TO REQUIREMENTS: You may skip FREE PLAYS

Unit 6 Lesson 17

Physical Outputs and LEDs

 to Dot 8a; Don't complete 8b or 8c

then work on 

NOTE: EACH PROJECT CODE MUST HAVE A MINIMUM OF 20 LINES OF CODE

--CAN HAVE MORE --

---NOT INCLUDING ANY COMMENTS---

05 May EOTY Fun
Early Dismissal
05 May Graduates

Finish CSF Express Course

springBreak.jpg
spring Break 4.jpg

Break

springBreak3_edited_edited_edited.jpg

BREAK

springBreak2.jpg

Unit 6 Lesson 9

Getting Screen Inputs

aasa.png

Writing Gr 3-8
ACT Gr 11

images.png

Gr 5&8 04-01

aasa.png

ELA Gr 3-8

aasa.png

Math Gr 3-8

iMovie

iMovie

iMovie

FFA.jpg

Discovery Conference

05 May Summer 2
05 May Summer 3
05 May Summer 1
05 May SchoolOut
scratch_mit_lab.jpg

Scratch Debug
& ActivityDay 1

Click the Scratch icon.

Scratch Debug

& Activity Day 2

Scratch Debug

& Activity Day 3

Scratch Debug & Activity

Day 4

 

NOTICE: LINKS ON THE  CURRICULUM PAGES WILL OPEN IN NEW TAB/WINDOW AND MAY TAKE YOU AWAY FROM THE  SAN SIMON SCHOOL WEBSITE;  USE AT YOUR OWN DISCRETION AND RISK.

I AM NOT RESPONSIBLE FOR OUTSIDE LINK’S CONTENT.  I WILL CHECK THE LINKS REGULARLY FOR APPROPRIATENESS AND ALTER AS NECESSARY. 

CONTACT ME IMMEDIATELY IF A LINK IS INACCURATE/INAPPROPRIATE

We use cookies on our website to see how you interact with it. By visiting, you agree to the use of such cookies.

bottom of page